Project Title : Sulfur Railcar Loading Facilities (SRLF) Project (WGP – BGP – KGP)
Location : Al-Jubail & Khurasaiyah
Period : Dec. 2015– Dec. 2017 (Completed)
Client : POSCO E & C / ARAMCO
Project Value : SAR 45,418,190.00

Discription : Building Construction for 14 Buildings with Total Area of 18,530M2 , Works including Steel Structure Erection and Misc. Steel works, Cladding works, Steel Decking, Reinforced Concrete Structure construction, Masonry, Plastering, Doors, Windows, Glazing, Tile, Ceiling, Painting, Coating, Waterproofing, and other associated items as noted above to complete the construction & finishing .

Project Title : Building Finishing Works – Package – 1 – Yanbu 2 Power & Water Project
Location : Yanbu
Period : Feb. 2012– Jun. 2016 (Completed)
Client : Hanwha Saudi Cont. Co. Ltd. – Marafiq
Project Value : SAR 89,848,900.00

Discription :Building Construction including Finishing Works for 18 Buildings, Total Area 49,542 M2, Works including Masonry, Plastering, Door, Window, Glazing, Tile, Ceiling, Painting, Coating, Misc. Steel Works, Waterproofing, Cladding work and other associated items

Project Title : Ad Duwayhi Gravity CIL Gold Project
Location : Ad – Duwayhi
Period : Jun. 2014– Aug 2015 (Completed)
Client : Hanwha Saudi Cont. Co. Ltd. – Ma’aden
Project Value : SAR 45,772,500.00

Discription : Building Finishing Works for Ad Duwayhi Gold Project, Total Area 18,000 M2 covering for Process Area & Village Area, Works including Steel Structure Erection and Misc. Steel works, Cladding works, Steel Decking, Reinforced Concrete Structure construction, Masonry, Plastering, Doors, Windows, Glazing, Tile, Ceiling, Painting, Coating, Waterproofing

Project Title : PDC Building Works – Qurayyah IPP Project
Location : Qurayyah
Period : Jun. 2014– Aug 2015 (Completed)
Client : Samsung C & T Corporation
Project Value : SAR 3,335,000.00

Discription : Power Distribution Building Installation for Floor Structure, Wall Panel, Roof Panel Including Completion of finishing works  – Total 19 No. of Bldgs.

Project Title : Water & Power Project, (Substation 23 & 24)  Yanbu II Marafiq
Location : Yanbu Industrial City
Period : Jun. 2012 – Dec 2013 (Completed)
Client : Hanwha Saudi Cont. Co. Ltd. – Marafiq
Project Value :  SAR 45,311,000.00 and additional

Discription :Building, Structural & Architectural works for Substation 23 & 24  and other structures. Also includes Floor Deck Slab concreting & Metal Cladding Panel Installation.

Project Title : STG Units 5&6 Project, Yanbu II – Marafiq
Location : Yanbu Industrial City
Period : Nov. 2010 – Dec 2012 (Completed)
Client : Hanwha Saudi Cont. Co. Ltd. – Marafiq
Project Value : SAR 36,937,500.00

Discription : Architectural works for Local Control Building, Steam Turbine Bldg. Water Treatment and other structures. Also includes Floor Deck Slab concreting and Metal Cladding installations.

Project Title : Water & Power Project, (Training Center Building) Yanbu II Marafiq
Location : Yanbu Industrial City
Period : Nov. 2011 – Jun 2012 (Completed)
Client : Hanwha Saudi Cont. Co. Ltd. – Marafiq
Project Value : SAR  12,641,000.00

Discription :Building, Structural & Architectural works for Training Center Building.

Project Title : Ma’aden Phosphate Power & Desalination Plant Project
Location : Ras Al Zawr
Period : Apr. 2009 – Feb. 2010 (Completed)
Client : Hanwha Saudi Cont. Co. Ltd. – Ma’aden
Project Value : SAR  56,062,500.00

Discription : Concrete Works, Civil, and Building fir steam   Turbine structure and equipment foundations, control building, Substation, Switchgear, Chemical Storage, Air Compressor Shelter, and misc. Shelter including corresponding finishing work.  In addition structure foundation for pipe rack, tanks,  equipments, desalination plant.

Project Title : Export Line Pipe Rack Civil Works – Ma’aden Ammonia Project.
Location : Ras Al Zawr
Period : Apr. 2010 – Sept. 2010 (Completed)
Client : Samsung Saudi Arabia Co. Ltd. & Ma’aden
Project Value : SAR  3,181,330.00

Discription : Concrete Foundation for Pipe Rack including Earth Work and Protection of Foundation

Project Title : Ethylene Amine Project – Arabian Amines Company – Jubail.
Location : Jubail
Period : Apr. 2009 – Sept. 2009 (Completed)
Client : Hanwha Saudi Contracting Co. Ltd. & AAC
Project Value : SAR  17,890,000.00

Discription : Concrete Works, Civil & Building Structure.  Building consists of MCC Building, DCS Building, Maintenance Building, Control & Lab Building, Drumming Building & Other Equipment Shelters

Back
Next
  • Home
  • About Us
    • Message From GM
    • Safety Policy
    • Quality Assurance Policy
  • Services
  • Clients
  • Projects
  • Gallery
  • Contact Us
© 2017 All rights reserved. ALFA AL KHALEEJ CONT. CO.